Answer Posted / maran
MRP-Material Requirement planning.It is used for multi
lelvel planning.But MPS is used for critical level or
single level planning.planning time fence is must for mps
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
How can I use variable size items?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What parameters you maintain in “plant parameters” in configuration?
Can we create production order without bom and routing ?
Explain the planning steps for 100 products?
Why and how you calculate WIP?
What is planned consumption and unplanned consumption?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
What is Inspection Points?
Explain what is “work center” in sap pp and what is the use of data in work centers?
Different types of Object Dependencies.
What is the difference between stock transport order and stock transfer order?
How system calculate the actual cost?
What is processing class, where we do them and why?