Answer Posted / nanduri k. prasad
MPS :- Master Production scheduling is generally done for
when the product groups exists. By doing MPS we basically
disagreegate the group requirements into individual product
requirements. By doing MPS we can disagreegate the plan and
we can only creat planned order for finished products.
MRP :- Materials requirment planning is done to drill down
for individual product once the planned orders for finished
products are created by MPS. However, we can use only MRP
for any individual material anytime.
| Is This Answer Correct ? | 19 Yes | 9 No |
Post New Answer View All Answers
What is a ‘bom’?
what are the constraints of Variant configuration?
After doing realization how we will check whether it is working or not?
What is SOP and types of SOP?
Steps to configure Production order type.
What is opening period?
What do we do in realization phase?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
How to attach a drawing for a material to bom ? Is it possible ?
Mention what are the types of master views for production and planning?
what is the major ticket in your experience
What is mrp list and what is the use of it?
What is scope of planning?
a company needs 12 standard values. how it can be maintained?
What is the t-code for changing production order and to display production order?