how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant
Answer Posted / nanduri k. prasad
There are different methods of doing product cost estimate.
e.g., Std. cost estimate or variable cost estimate.
From the BOM and routing the total no of components used
for that product is calculated using the price mentioned in
accouting views and from routings each operation cost is
calculated from the activity types defined in workcenters.
Collectively this cost is displayed in Product cost
estimate as cost of manufacture in the T.code CK 11n.
In case of variable cost, all the variables are considered
for the production order and the actuals are considered for
calculating the product cost. It is also posible to have
cost estimates and actual costs from which we can find the
variances.
| Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
How to create prt master records?
What is group bom?
Mention what are the types of master views for production and planning?
What are all the settings done for configuring the integration of pp with fico?
How to delete a group of products that was created in screen mc84 ?
What is Backflush, the places where the backflush is used?
Explain the mrp group and their uses.
What is recursive BOM
How is time management and payroll is integrated?
What is MRO area & MRP group & some difference
SPRO path for order, confirmation or requirement class.
what are the problems you faced in MRP?
What is the purpose of Catalog? how you reverse UD?
Explain why their is need of production version ?
How you get the ticket?