how costing is done in pp or how u will know the cost of a
product which is manufactured in ur plant
Answer Posted / nanduri k. prasad
There are different methods of doing product cost estimate.
e.g., Std. cost estimate or variable cost estimate.
From the BOM and routing the total no of components used
for that product is calculated using the price mentioned in
accouting views and from routings each operation cost is
calculated from the activity types defined in workcenters.
Collectively this cost is displayed in Product cost
estimate as cost of manufacture in the T.code CK 11n.
In case of variable cost, all the variables are considered
for the production order and the actuals are considered for
calculating the product cost. It is also posible to have
cost estimates and actual costs from which we can find the
variances.
| Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
Integration between PP and QM Module.
What is Inspection Points?
List out the basic procedure for dispatching operations in capacity leveling?
Why is work scheduling required for semi finished and finished products?
What are the customer activities followed for pp module ?
Explain how ‘pp’ is ‘integrated’ with other modules?
What is the use of data in work centers?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
Explain transaction code KO88 or CO88.
How to create opbject dependencies in a bom for a configurable material?
What is opening period?
What do you do to run MRP for just one MRP Controller?
What are some important tables used in pp (production planning)?
What is prt (production resource tools) in sap pp?
Explain what is the need of mrp list if the stock requirement list is already given?