hi frnds ,, this is yuva what is performnce testing and
volume testing & differnces also ,,,,
Answer Posted / prabhat ranjan
Hi friend
Performance Testing :Here we are testing the performance of
the given software which may includes the size of the
software when installed, the amount of main memory and/ or
secondary storage it requires and the demands made of the
operating system when running within normal limits or the
response time.
Definition:
To determine whether the program meets its performance
requirements.
The IEEE standard defines performance testing as testing
concluded to evaluate the compliance of a system or
component with specified performance requirements.
Many programs have specific performance efficiency objectives.
Performance test focuses on performance parameters such as :-
- Transaction response time.
- Throughput etc.
e.g.:- in database system the response time relates is the
time to obtain report after checking in a specific button.
The time related features within the performance testing are:
Response time
Throughput (Slide time delay)
Performances Testing includes
1.Load testing
2.Stress testing
Load testing:Load testing is performed to test
How much load a system can withstand?
How system performs as load increases i.e. its response time
throughout system crashes.
Stress Testing :Stress testing is performed to test
Stress testing is subjecting a system to an unreasonable
load while denying it the resources (e.g. RAM, Disc, CPU,
network, bandwidth, etc) needed to process that load.
The idea is to stress a system to the breaking point in
order to find bugs that will make that break potentially
harmful.
The system is not expected to process the overload without
adequate resource but to behave (e.g. fail) in a decent
manner (e.g. not corrupting or losing data).
Bugs & failures modes discovered under stress testing may or
may not be repaired depending on the application, the
failure mode, consequences, etc. The load (incoming
transaction stream) in stress testing is often deliberately
distorted so as to face the system into resource depletion.
VOLUME TESTING : To determine whether the program can handle
the required volume of data or not.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Tell me some test cases on mobile features testing and feature interaction testing?
List out some of the automated mobile testing tools?
Why mobile phone has digit numbers?
List out the networks to be considered while application testing.
what happens to agilent tool when mobile connected to it crashes and how to test call forwarding in agilent tool
What is mt sms message?
What are the defects tracking tools used for mobile testing?
What do you mean by streaming media?
What does mobile security testing include?
Explain what is Robo-electric testing framework?
how to test different screen sizes of the devices
How to perform testing on old versions of android and IOS ? If real device is not available.
Explain critical bugs that you come across while testing in mobile devices or application?
Where to perform forward compatibility testing?
i want to know abt AGILENT8960 AND SAS TOOL.PLZ REPLY ME SOON