Are cost center assignments hierarchical? Where do you
assign these in OM?
What do you mean by planned times? Where are these stored
for an employee?
What do you mean by actual times? Where are these stored
for an employee?
What do you mean by deviations? Where are these stored for
an employee?
What is time management status 7? What is it used for?
What is RPTQTA00? What does it do? What is RPTIME00?
Answer Posted / nipun khanna
Yes Cost Center assignments are hierarchical,but can be over
ridden by manually maintaining Accout assignment infotype.
Planned working time stores the time an employee have to
work for any given day. these are stored in IT0007 planned
working time.
Actual times are the actual time events ( swipe in swipe
out). depending upon configuration these are stored in IT0050
Time Management status is defaulted into IT0007 by feature
TMSTA. it defines the time evaluation used for particular
employee.
RPTQTA00 is quota generation report.
RPTIME00 is Time Evaluation driver.
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
What is shift planning?
How to got Employees salary in every month last week on last Friday ?
What is structural authorization?
Explain staffing status.
What is sap hr?
what infotypes are used in travel management?
Reports in pa & om integration/integration tools
Specify the relationship between the planned workingtime (infotype 0007) and basic pay (infotype 0008).
What is the role of an administrator in personnel administration?
Explain the structures in sap human resources/hcm?
Explain controlling area. How do you assign it?
what are the elements on which the input permissibility of a wage type depends?
What is Hcm Master Data In Sap?
What are dynamic actions? Give a few examples. What are the it's you used in them.
Where can you evaluate the wage types?