What is Ohms law?
Answer Posted / vijaykumar
Ohm's law states that current is derectaly proporation to
voltage and inversely proportional to resistance at a
constant Temparature. there fore I=v\r.
| Is This Answer Correct ? | 11 Yes | 3 No |
Post New Answer View All Answers
how can i get the formula to find out the cable size if i know the load of main fuse protection.
why we dont prefer ac voltage controller instead dimmerstat [if both have same rating] for conducting experiments in laboratories?
How Calculet The UPS AH In Load
WHAT IS DEGREE OF COMPOUNDING IN D.C MACHINE MEANS? HOW TO READ THE OPERATING CHART FOR ANY ELECTRICAL MACHINES?
how to estimate wiring ins roughing ins. and boxes
explain supply side and demand side energy management with advantages & disadvantages
hi i have applied for lic of india south cenrtal zonal ,hyd. i didnt get hall ticket till now.let me know how can i get form internet
What is the count of hvdc transmission lines in india?
I have done my m.tech in electrical engg discipline. Can any one please suggest me how should I prepare for getting into phd in iit or nit.How should I prepare for getting into lecturership
how is the cable tray designed & how its total length is calculated for an Industrial plant Say for Ex. (500KW Motor Load)
how to remover corona effect and hysteresis losses from contactor
it is in our knowledge tht right plug of supply of residential suppy system is phase n other is neutral...howevr the battery charger of mobile works in both ways...i mean it is not restricted in only one direction.ny of the holder of charger can hav phase .so y is it not lik tht phase of supply must b connected 2 phase of charger...?
What is PQA???Applications........
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
is there any phase difference occurs while primary and secondary side mutual induction occurs?