Answer Posted / santosh sunkoji
Quality Assurance makes sure you are doing the right things,
the right way.
Quality Control makes sure the results of what you've done
are what you expected.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What the difference between pilot and beta testing is?
Explain incremental integration testing?
how to download fullversion of JIRA(defect reporting s/w) s/w for free.can any provide web site for full version free download.
Every One is saying that Documentation is very very importent in Tester's Life.Could any one explain with proper examples..?
What n+1 testing is?
Hi i am urgently in need of the ISTQB sample exam questions by John A Estrella and Maria C Estrella as i am going to take the exam at the end of this month. Please send the ecopy of this book to tselvi83@yahoo.co.in
In white box testing, what do you verify?
Explain the tasks of test closure activities.
What is your primary role in your project?
Why can be tester dependent on configuration management?
What is validation and verification testing?
What is test result analyzer?
What is the maximum length of cable supported in SCS-1,2 and 3?
How would you estimate the amount of re-testing likely to be required?
Mention what the difference between a 'defect' and a 'failure' in software testing is?