How do you prepare Bug Reports ? What all do you include in
Bug Report ?
Answer Posted / bhargavi
Bug report preparation:
1.click on Track defects tab(mandatory)
2.click on add
3.enter all the details like:
summary:---> what test u r performing..say gui test on a
particular window
detected by: tester
version:
date:
assigned to: developer
status:
test set:
project id:
select:
severity:
priority:
In status field there r 6 options:
New--> when the bug is detected for the first time
open--> after sending the bug report to the developer
rejected---> when the bugs are found in the modified
version of the application that is sent by the developer
re-open--> when the bug report is sent to the developer for
subsequent no of times..
fixed--> when the modified version of the application is
found free from bugs..
closed--> the status is selected by the QA Lead after
verifying the test to confirm whether it is passed r not.
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
How can we split the tests in Test Director?
How can we connect defect report from testlab&testplan tabs?
how many ways are there to copy test cases in test director
How do you ensure that there are no duplication of bugs in Test Director?
what are the type of testing and methodologies
What r the views in testdirector?
How to generate the graphs in test director?
How you integrated your automated scripts with testdirector?
Can we export the files from test director to excel sheet? If yes then how?
Is there any possibility to restrict duplication of defects being created in td?
What is the difference between master test plan and test plan?
What is Business Process?
How to use testdirector in real time projects?
How many versions are there in Test Director.
What is EXPORT AND IMPORT in Quality Center (pl. Explain with easy steps to understand.)