what is diff. between CMMI and CMM levels?
Answer Posted / guest
cmm means that capability meturity model
in these 5 models r there
they are 1.initial
2.repeatable
3.defined
4.managed
5.optimising solutions
where as cmmi means that capability maturity model
integrations.
| Is This Answer Correct ? | 29 Yes | 4 No |
Post New Answer View All Answers
Hi All!!Can anyone please suggest some better website to learn Mainframe Testing??Am very much new to Mainframes. Thanks in Advance Nithya
Explain path testing?
have u write any sanity testcases?
Explain acceptance testing?
What is coverage measurement?
What is depth testing?
Please some one answer these Q's 1.Modules in Pension Domains ? 2.What Should we Test on Pension Domain.? Thanks in Advance Stewie
I. Requirements are formally reviewed. II. Requirements are formally approved. III. Requirements are placed under configuration control. IV. Requirements are implemented in code. Using the above statements, when are requirements considered baselined? 1. I and II 2. I, II, and III 3. I, II, III, and IV 4. I only 5. I, III, and IV
What would you say to your boss if he?s crazy about an idea, but you think it stinks?
What is exhaustive testing?
What is test result analyzer?
What is class level methods?
What is static analysis?
What is quality assurance (qa)?
In practice, which life cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and system integration testing after system testing.