what is the use of item number in maintenance order ?
Answer Posted / subhrajyoti bhattacharjee
Item number refers to the number (not material number) to
identify the material component that is to be used for an
operation in the maintenance order.It is generally given in
increments of 0010.It is the first field in the Components
tab of a maintenance order.
| Is This Answer Correct ? | 30 Yes | 1 No |
Post New Answer View All Answers
What must you do if you have assets (functional locations) with the same number in several plants?
How can a user find "commit work" statement in the pm orders (t-code iw32)?
What is the order type for breakdown maintenance?
How can a user differentiate simply between an equipment which has been charged and not charged for a service?
What is reference functional location?
What is t code to create a catalog code and code group?
Can a service order be generated automatically without running ip30 if we have scheduled a maintenance plan?
Where is a service contract assigned to a piece of equipment?
What is difference between corrective maintenance and preventive maintenance?
Differentiate between equipment master and material master. On what basis do we decide which one should we create?
What is value category?
What is control key?
How pm module is integrated with fi module?
What do the ik08 tcodes in sap- pm mean?
Which movement type is used to post goods movement against reservation triggered from maintenance order? Is it possible to change it?