In "V" model of SDLC which phase correspond to integration
testing:
1. Requirements
2. Analysis
3. Design
4. Coding
Answer Posted / ella
In the V Model hte integration testing corresponds to the
design phase. As this is the phase where the high level
design and functionality of the application will be
determined before coding them. At the coding level, unit
testing would be done and then when coding is complete it
and unit testing is over, the integration testing would be
done. The integration test cases would derive their input
from the design specifications document.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is fuzz testing and when it is used?
What is sei - software engineering institute?
A type of functional testing, which investigates the functions relating to the detection of threats, such as virus from malicious outsiders?
HOW TO PERFORM DATABASE TESTING
What is the role of quality assurance in a product development lifecycle?
Explain path testing?
What is heuristics testing?
What is difference between SAN and NAS? How SAN is better than NAS?
Why can be tester dependent on configuration management?
What is the difference between web application and desktop application in the scenario of testing?
Explain test bed?
Explain debugging?
What is considered to be a good test?
Mention what bottom-up testing is?
what kind of test cases will you suggest for an atm machine