Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In "V" model of SDLC which phase correspond to integration
testing:
1. Requirements
2. Analysis
3. Design
4. Coding

Answer Posted / meetu mahajan

The design phase corresponds to the integration testing as
this is the phase where different modules / sub systems of
a system are defined. After this phase only the integration
test scenarios / cases can be written.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is validation and verification testing?

1066


Explain inspection?

938


The purpose of which is to allow specific tests to be carried out on a system or network that resembles as closely as possible the environment where the item under test will be used upon release?

1123


What is branch coverage?

970


Explain compatibility testing?

1135


When is rtm (requirement traceability matrix) prepared?

1095


What is cause-effect graphing?

1028


I need to learn everything I can about Function, Non-Functional and Regression Testing. What is the best online resource?

1225


What is data validity?

1022


What is parallel/audit testing?

1197


What is total quality management?

1035


The Following Characterstics posses some XYZ company. * Uses formal standards and policies * Conducts software inspections * Has advanced configuration management and change control * Uses CASE tools * Has a software engineering process group * Gathers metrics on process and quality * Requires that developers have formal software engineering training * Practices continued process improvement Based on aboue , Tell me which CMM Level is the company..? 1. Level 1 - Initial 2. Level 2 - Repeatable 3. Level 3 - Defined 4. Level 4 - Managed 5. Level 5 - Optimizing

2181


What is bottom-up strategy?

1078


Explain system testing?

993


what should be analyzed in laod testing?

1097