what is client requirement in scheduline catergory?

Answer Posted / samal

Client requirement in Sc whether TOR,AV check, should be
carried out whether PR is generated or not

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how text is determined in Invoice,What are tools used in To_be study

2195


Can one business area be valid for several company codes?

616


what is the use of billing report

1450


When you think of the five possible elements necessary for the account determining during posting of a sales invoice – where from does the system get the information?

595


What is the difference between the delivery document & scheduling?

608






Is there a way to provide external carriers with access to sap transportation management information and transactions? : transportation management

707


What is the procedure to handle reservation process in sap SD?

2011


What happens when the exclusive field was ticked in the access sequence?

597


What is billing type and how do you define billing types?

592


What are the effects of posting goods issue?

635


Once the system determined the item level schedule line category automatically in the sales order, can you still change it manually?

595


IF u have worked on EDI IDOC, while sending PO to vendor how u connect to the system. Tellme the entire design and steps of the screen. how it looks.When i told we need to create port, partner profile, outbound idoc process. Interviewer not satisfied.

1804


Can you assign two different sales organization to the same company code?

597


How do you control entry possibility of condition values at order through condition type settings?

702


what is the difference between sap credit memo request and sap credit memo?

655