Answer Posted / tvl
All modules in build covered.
test duration exceeded.
all major defects solved.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
What about manual testing opening in bangalore in September. Not getting a single interview call from last one month.
List the considerations in developing testing methodology
what is the critical defect in telecom domain?help me out from this prob its very urgent
In cycle 1 we have 100 test cases out of which 95 test cases are PASS and 5 test cases are FAIL. So in cycle 2 how many test cases performed as a part of regression testing?
What is the difference between a standalone application, client-server application and web application?
what types of bugs will we find out in banking projects
Give the real-time example for back-to-back testing?
write test case for linked in sign up page ?
When to stop testing? (Or) how do you decide when you have tested enough?
What is a code walk through?
Hi, I want "Intergraph" placement papers for experienced people which was conducted recently in Hyderabad. Thanks, Purnima.
I want to know about satyam manual testing questions
how to write defects in excel sheets when defects occured
iam having 2+yr sof exp in manual testing, at present working in chennai,want to relocte to hyd .if any openings let me know.my id : vaniramymail.com
What is an error?