how to know a component create date after WO released
Answer Posted / anirban ghosh
(a.) if it's creation date of the component material:
co03 - component overview - double click the
component - i-symbol, information on material.
(b.) if it's material assignment date to BOM:
can be found through BOM history.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
How to delete a group of products that was created in screen mc84 ?
What is standard order type
What is scope of planning?
What are all the settings done for configuring the integration of pp with fico?
Define mrp list
Mention what is the purpose of using capacity planning?
What is the use of t-code cs20 in bom?
Explain what is prt (production resource tools) in sap pp?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is a ‘bom’?
what do you mean by planning time horizon
What are the three 'mrp procedures'?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Difference between PP and PI.