Answer Posted / purni
Hi Kiran,
Smoke testing is done when we receive the new
build not before the release. This is done to check the
stability of the application and to find if there are any
broken links in the application. This is done by checking
the links and some random check on the application
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how will you do execution workflow, creat and modify test sets
I installed TestDirector 7.6 on my PC which has windows media center edition. It was working fine in the begining. But now when I try to start it, I get the message, "cannot connect to databas. The data base version is older than 7.5, please update database". I am using MS Access as the database. Any help would be appreciated.
How can we create our own defect template from test director? Is it possible in test director?
What r the mandatory fields in TD?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
How do you analyze your test results? What metrics do you try to provide?
Explain the project tree in test director?
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
how many ways are there to copy test cases in test director
What is the difference between master test plan and test plan?
How to use testdirector in real time projects?
How you integrated your automated scripts with testdirector?
how do you integrate Perl or shell automation scripts in TD?
how do u call data file and gui file in testdirector
abbreviation for CHAT?