After you have completed the first phase of running
the 'Test Cases' in TD, now that you have set the status of
each step as Pass/Fail. How will you run the same 'Test
Cases' for regression testing (say for 2rd or 3th build)?
Answer Posted / ashish
Instead of going for new runs on existing test cases, I
will go for a new Test Set and add the required test cases
from to be regressed from the Test Plan. The new test set
can be named as 'build <number>'.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What is the Change management ?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
How you integrated your automated scripts with testdirector?
How to map testcases with requirements in test lab?
Is there any possibility to restrict duplication of defects being created in td?
how many ways are there to copy test cases in test director
how can we see all fields in test director
How can you run automated test cases td (quality center 9.0) ?
abbreviation for CHAT?
How to use testdirect like a dashboard?
What is the difference between master test plan and test plan?
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released
Can any one tell how to install the TD in our system?
What is the main purpose of storing requirements in test director?
Hi All, Im currently getting to grips with the Document Generator in Test Director and have a query. We use TD to link requirements to test cases and I am attempting to produce a report which lists the requirement and the test case it is linked to. I cant see a way to do this as the test case link info resides on the Coverage page and it appears the only field available to display for requirements reports within document generator as those on the 'details' tab. Any tips?