Answer Posted / babuji
MATERIAL MASTER
BOM
WORK CENTER
ROUTING
MRP
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
What is the purpose of Catalog? how you reverse UD?
What is meant by payscale structure? How did you configure the payscale structure?
What is the uses of production scheduling profile and what the configure have you done current project
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Difference between standard cost and variable cost.
What is the SPRO Path for requirement class and req. type?
What is golive actually? What is the role of a functional consultant in golive actually?
Can’t one material be assigned to more than one operation in a routine?
Explain how to create prt master records?
How can you get planned orders scheduled so that you can do capacity leveling ?
Explain how ‘pp’ is ‘integrated’ with other modules?
What is mrp list and what is the use of it?
Explain the mrp controller and their uses.
What is the planning time fence?