A PO has 50 items all the 50 items have the same price.
Instead of entering the price for each item 50 times is
there any option in SAP where the common price can be
entered in one go?
Answer Posted / gauri shankar kothari
It can be done through by using the fast change option at
the time of creating the PO. System will display all the
fields available which can be created or changed for all
items.
Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
What are the special stocks used in mm?
How is material information structured in material master records?
What is split valuation? When is it used?
What are the various types of master data in the mm module?
What are the main components of the mm module?
What is an abc indicator?
How will you map subcontracting process for project stock?
Explain batches. How would you search them?
What is invoice verification?
What is the use of ‘partner functions’ for a vendor?
What do you mean by a reservation?
hello guys, could you tell me the few difficult tickets that you have solved in SAP MM??
How do you display a list of all reservations in the system?
What’s the real value of this upgrade from a technology perspective?
The material does not have a master record. How can we procure that?