Answer Posted / palanikumar.a
along with the purchase organization,plant we should
maintain at purchasing group and company code level.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
Explain cut-over process in sap mm?
How can you disable a reservation in mrp?
What are the prerequisites of creating a purchasing info record?
While posting gr there is a checkbox item ok. Is there any way to make it default? Will you do an enhancement in system?
What is a material master file?
What are the possible values of procurement type in material master?
What setting are required to run quota arrangement to determine vendor?
What are the essential components in sap mm?
What are the initial configuration steps for physical inventory?
Explain why a 'material master' is divided into views?
Explain the types of subcontracting stocks in sap mm
What is mysap erp?
What are the main master files used in mm?
Upto what extent we can increase the length of materials master short text.
What are some of the initial configuration steps for purchase requisitions?