Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the best design for building bridges?

Answer Posted / mishijoshi

v can't recommend a design 2 b d best unless untill tat
fullfill aal of d requiremnts of d particular given project
site..regarding... stregth,performance,expected loads
(expected earhquake n wind),environmntal,soil
conditions,availability of materials n last bt not the
least d appearance. so on d basis of all of d above
criterion one bridge can b d best for a patricular site
while d same cannot b even an optin 2 b considered for sum
other site. can explaon it with 2-3 eg's.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2131


For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38

1938


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

4238


Define What is aggregate?

1224


How to come 1.54 from dry to wet concrete? 

2311


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

2050


What is meant by cartesian coordinate system?

1211


Define What is the origin of name Railway Sleepers?

1332


Why steel rods are produced only in even dimensions?

2692


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2502


what is detail procedure of eccentric footing? plz. give solved exmple?

2372


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

2111


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2288


What do you mean by bond? What are the different types of bonds?

2284


Write short note on construction programme for pile foundation.

5473