Answer Posted / mishijoshi
v can't recommend a design 2 b d best unless untill tat
fullfill aal of d requiremnts of d particular given project
site..regarding... stregth,performance,expected loads
(expected earhquake n wind),environmntal,soil
conditions,availability of materials n last bt not the
least d appearance. so on d basis of all of d above
criterion one bridge can b d best for a patricular site
while d same cannot b even an optin 2 b considered for sum
other site. can explaon it with 2-3 eg's.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is GSB gradation
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
Why joints are provided?
Explain soil analysis?
how to design and calculate materail quantity for concrete speedbreaker ?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Define What is an ice dam sock?
all technical question
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What is the zero value in quantity surveying
What is Refuse Area In High Rise Building ?
What are the Types Of DPC and its Thickness used?
what is civil engineer greatest strength and weakness?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Floor tile measurement? Wall to wall or skirting to skirting