Answer Posted / honeywell
If you are producing several similar products that have a
lot of common parts, you can describe these products using
a variant BOM. take the example of car which starts from
basic models (power staring & AC) middle end (power
staring, power window, A/c)
upper models ( power staring, power window, A/c , music
system leather seat this is the variant types of car.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
What is the use of QM control key?
Different types of consumption based planning.
What are all the settings done for configuring the integration of pp with fico?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
How do you do capacity planning ?
What happens to plan after it has been converted into production order?
Why is work scheduling required for semi finished and finished products?
Explain the mrp group and their uses.
Explain what is “work center” in sap pp and what is the use of data in work centers?
Define mrp controller
Mention what is the production process in sap?
What is the difference between pp and pp-pi? Which one is better and how ?
Overlapping and splitting, where do you assign?
What is the planning time fence?
What is the SPRO Path for requirement class and req. type?