Answer Posted / devendra
It means parameter requires for the order creation.it is
necessary in order creation.
the stepwise customization for the order as follwing
1) create order type i.e. pp01
it is require,what type of master data to be picked up
during the order creation i.e.number range & controlling
parameter
2)assign the number range to the order type created.
it is mandatory entry, otherwise system displays error
3)create the parameter for schedulling margin key.it
requires how to schedule the prodyuction order.
4)confirmation parameter requires to complete the
production.
5)default values requires to define operation in production
order creation.
All such settings are performed in shop floor control
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
In lsmw which is the most important step?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
what is alternative item group
Explain what happens to planned after it has been converted into production order?
What do we do in the realization phase?
What do you mean by basic dates
What are sequence, parallel, overlapping, splitting and where can we assign these
Scheduling times can be defined in the material master record by?
What is Phantom Assembly?
What is sap pp?
Consignment matl how will be use
What is the transaction code to run MRP for sales order?
What is 'mps' (master production scheduling)?
How many levels of Flexible Planning are there?
Explain variant configuration