Answer Posted / shivanand bagalkoti
varienr material can be understood by somple ex CAR is
varient material car having diff colour spec like 1000cc
2000cc , fuel type petrol / diesel engine , no of cylinder
like 3 / 4 / 6 cylinder , steearing type power steering /
acmerman steering ,
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is the use of infogroups?
Question related to Production order status or status profile?
Explain what is prt (production resource tools) in sap pp?
What is MRP Area or How can I excluede one storage location stock from MRP?
Tell some standard order types and what configure done for current project
Integration between PP and MM Module.
What is the difference between pp and pp-pi? Which one is better and how ?
Define ‘bom group’?
What is the uses of production scheduling profile and what the configure have you done current project
What is the use of t-code cs20 in bom?
Difference between MD01, MD02 and MD03.
List out the activities carried out in production planning?
What is mrp group and what is the use of it?
What do we do in realization phase?
Difference between different strategy groups.