adspace
Answer Posted / Pradeep Kumar Gautam
Calibrating a Coriolis flow meter involves the following steps:
1. Prepare a known volume of a calibration fluid (usually water or air).
2. Install the flow meter in a pipe, and connect it to a pump, pressure gauges, and flow rate controller if necessary.
3. Run the calibration fluid through the meter at various flow rates while monitoring the readings from the meter.
4. Compare the actual flow rate (from the known volume of calibration fluid) with the readings from the flow meter to determine any discrepancies or errors in the meter's readings.
5. Adjust the meter as needed, using manufacturer-provided instructions, to correct any errors and ensure accurate measurements.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
principle of dead weight tester ?
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com
Question on maha cement
plz send me general of ongc
Questions on flow meters,few questions on HART protocol,
I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..
send me last 5 years questions asked in rrb chennai, for section engineer
Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .
send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
can any send me a forbes marshall dtron 316 manual
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.