adspace
Turbidity analyzer working principle ?
Answer Posted / Pramod Kumar Maurya
A turbidity analyzer measures the cloudiness or haziness of a liquid by detecting the amount of suspended particles in it. It works by sending a beam of light through the sample and measuring the intensity of the light scattered back by the suspended particles. The more particles there are, the higher the turbidity level.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
this site is owned by an nonsense
sir, give me placement papers and interview quistion of birla group company of copper.
hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com
plz send me general of ongc
plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}
any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
principle of dead weight tester ?
hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.
hye SAM acn u send your e mail id, so that i can solve my query through e mail?
send me last 5 years questions asked in rrb chennai, for section engineer
hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com
I WANT SECURITY PAPER MILL, HOSHANGABAD TEST PAPER.KINDLY SEND TO MY MAIL ID
Questions on flow meters,few questions on HART protocol,
please send data bank of quetions answers on analytical instrumentation.