adspace
One component we can assign to workcenter at routing
Answer Posted / Govind Singh Patel
In SAP PP (Production Planning), a single component can be assigned to multiple work centers within a routing if those work centers are capable of performing the operations required for that component.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers