1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
Answer Posted / Vishal Kumar
HT (High Tension) and MV (Medium Voltage) earthing systems should not be linked in a pole-mounted transformer substation due to safety concerns and operational considerations. Here are some reasons:
1. Different voltage levels: HT and MV systems operate at significantly different voltages, which can create hazardous conditions if they are improperly connected.
2. Ground potential rise (GPR): Linking the two earthings can cause ground potential rise, which might induce undesirable currents in nearby neutral conductors, leading to equipment damage or even electrical fires.
3. Insulation coordination: The insulation between phases and between phase and earth is designed based on specific voltage levels. Mixing HT and MV systems can lead to improper insulation coordination and increased risk of accidents.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
XYZ
hi can anyone pls tell me the eee interview core questions asked in l&t
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?
Draw the circuit of clapp oscillator?
How much minimum insulation required between 11kv/3.3kv transformer windings?
1. for eg, capacitor is used for many purposes(it act as filter, oscillator, bypass capacitor, memory storage etc...) 2. Please tell me some example circuits for different uses of capacitor( whenever and whereever and however we used capacitor as a filter, oscillator tuning etc..) 3. similarly for inductor and resistors(it act as what?) and when and how we want to act as like that?, and how we can used these components depends upon our requirments with example circuits and explanation? design to act as these components depends
HAI SENT HPCL APTITUDE QUESTION PAPER, MY EMAIL ID IS angus_eee04@rediffmail.com,angus_eee04@yahoo.com
Anybody tell me about modbus hex address of l&t trivector meter er300p??I want to read voltage,current,kwh etc via rs485...If anybody have a manual then send on my mail..Brijeshmodi18@gmail.Com
Yazaki india pvt ltd interview questions qurey related
Draw a block diagramof Three UPS systems connected in Parallel mode?
hi friend i am going too attend for hpcl in this month please help me by sending written test question papers i am in the stream of E.E.E
sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
please send me previose rrb junior engineer qustion papers
compare between starting charactristics of synchronous motor with those of 3Q Squirrel cage induction motor