what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

Answer Posted / Farhqe Alam

The cost of a 125mm thick RCC (reinforced concrete) slab or the measurement of 52x33.75 feet depends on various factors, including labor costs, material costs, location, and local construction practices. Here is a general breakdown of the estimated costs:

- Concrete Material Costs: Assuming a typical concrete mixture costing $100 per cubic meter ($34.42 per cubic yard), a 52x33.75 feet slab with a thickness of 125mm (or 1.25m) would require approximately 69.3 cubic meters (243.8 cubic yards) of concrete. The material cost for this amount would be around $6,930 ($24,382).
- Labor Costs: The labor costs for pouring and finishing a concrete slab depend on the region and local labor rates. On average, the labor cost may add an additional 15% to the material cost, bringing the total cost to around $8,400 ($30,618).
- Formwork Costs: The formwork materials (such as wood or steel) required for shaping and supporting the concrete during the pouring process add another 5% to 10% to the total cost. Assuming a 7.5% increase in cost, the total estimated cost for the RCC slab would be around $8,962 ($32,452).

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please send me bhel questions on rupesh.017@rediffmail.com

2797


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2107


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2060


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2365


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2423


water leak detection system question & answer

2526


what is the 0 value in quantity surveying

2480


I need to constructive work in amaraj batteries

1939


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


400 ku d/c clearess ketan hota hai?

2124


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2594


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2234