adspace
Answer Posted / Ashutosh Pandey
Currently, I am an experienced Civil Engineer working full-time for a well-known construction firm. In my role, I design and oversee the implementation of various civil engineering projects.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how can we calculate steel value, depending on load
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is the 0 value in quantity surveying
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
plz.show development and anchorage length in simple diagram.
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
please send me bhel questions on rupesh.017@rediffmail.com
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
I need to constructive work in amaraj batteries