Answer Posted / padmas
Test harness is nothing but tested code, build is robust enough to identify the defects or bugs if any. Testing the unit for its robustness, durability and efficiency over a period of time. Even if code unit contains the defects or bugs it will not deviate the functionality it is expected to perform without any interruption, is sometimes known as test harness. While conducting the Quality assurance tests, the team look for test harness for each unit and conforms to the standard level of test harness measures to be taken.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is bottom-up strategy?
When should exploratory testing be performed?
Explain configuration management?
What are verification and validation?
Which one of the following activities is the most efficient and most cost effective at identifying defects? 1. Prototyping 2. Unit test 3. Beta test 4. Design/code inspection 5. Risk analysis
Which is the best institute in chennai to learn Softyware testing? Please help.
What is v&v?
What is data validity?
Is it true that we can do system testing at any stage?
In real time how you do the soak testing?
What is stochastic testing?
what is the difference between black box testing and white box testing?
What is test management review and why it is important?
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), WHO are the stakeholders of each stage?
What is the mission of testing?