Explain what is PRT – how many types of PRT is used?
Answer Posted / tejas d
PRT is Production Resource Tool which is a term used in SAP for the actual tools or equipment used in Manufacturing industry but are not consumed in production process.
E.g. Hammer, Gauges, bearings, etc.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In the monthly lot size proc, how to generate lot at the end of Period?
Do you have any idea about Capacity Planning?
What do you mean by basic dates
What is SOP and types of SOP?
Difference between base unit of measure, production unit, order unit
How do you restrict the data to be entered in the payroll area?
Explain the Difference between the Discreet and REM.
What are traffic lights in mrp?
List out the activities carried out in production planning?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
How do I default it 41?
What is the planning horizon?
What is the SPRO Path for requirement class and req. type?
Explain In-process inspection.
How does sap know that an operation has components as indicated by the component allocation indicator?