For REM the settings are dependent or normal?
Answer Posted / adnan
For REM (Repetitive Manufacturing) in SAP PP, the settings are generally dependent on the production process and requirements of the organization. REM is a manufacturing strategy where identical products are produced in large quantities at regular intervals, with a fixed production rate and lead time.
The settings for REM can vary depending on the specific production process and requirements, but some of the key factors to consider when setting up REM include:
Production rate and lead time: The production rate and lead time should be set to meet the demand for the product, while ensuring that production is cost-effective and efficient.
Bill of materials (BOM): The BOM should be accurate and up-to-date, with all components and materials required for the production process.
Work centers and routing: The work centers and routing should be defined to reflect the specific steps and processes involved in the production process.
Capacity planning: Capacity planning should be performed to ensure that the required resources (machines, labor, and materials) are available to meet production demand.
Material requirements planning (MRP): MRP should be set up to ensure that the necessary materials are available when needed for the production process.
In summary, the settings for REM in SAP PP are dependent on the specific production process and requirements of the organization. The settings should be configured to ensure that the production process is cost-effective, efficient, and meets the demand for the product.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is internal payroll process?
What are basic dates?
what do you mean by planning time fence
What is group bom?
Explain the uses of the simple maintenance interface?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is mrp group and what is the use of it?
What is phantom item & sub contracting
What is alternate item group?
Explain different inspection type you used .
define variable cost
What are dynamic actions? Give a few examples. What are it’s you used in them?
Explain DMR.
What is the use of QM control key?