In my power station 220 volts dc battery set. they coneected 84th cell taped
Answer Posted / devi
cell tapping is done to avoid boost voltage to the load. boost voltage will be use only for charging the battery , as it is higher voltage it should not be applied to load , to avoid that 84th cell tapping is done .
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
In which of the following case, the rotating magnetic field is reversed? A regenerative breaking B plugging C dynamic breaking D forward motoring
while starting a liquid starter ,is there any volage drop on water/soda on tank.can we touch the tank on starting?
75 kw motor take 45 amp in no load delta in star 10 amp but in load it will take 160 amp but IR velue of winding above 500 at 1kw ph to earth and ph to ph. what problem it should be?
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
What is resolution of a measurement?
My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?
PLZ SEND ME SOME UNIQUE PROJECT OF ELECTRICAL ENG (B.TECH)
How do the synchronizing lamps indicate the correctness of phase sequence between existing and incoming alternators?
EXPLIAN THE IMPORTANCE OF POLY PHASE CIRCUIT.
l&t switch FN 63 handle position can we change
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
STATE WORKING OF VACCUM CIRCUIT BRAKER?
why electronic instruments is more favorable than electrical?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating