T-code/procedure for extend the material to other (new)
storage location within the same plant
Answer Posted / bhumistar
Hi,
You can use T-code MM01, where you just enter Material code and then Plant Code.
After that enter Storage Location for which you would like extend it.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is use of material type unbw?
How do you generate an automatic po after creating a pr using a particular material?
How do we create consignment stocks?
What are the various types of master data in the mm module?
Upto what extent we can increase the length of materials master short text.
Define “client.”
Explain the terms planned delivery and gr processing time?
If I implemented mdm very recently, should I upgrade?
How is stock transfer from one storage location to another done?
What are the plant-specific data in the material?
What is the last step in the procurement cycle?
What settings required to create purchase order automatically from a pr?
What is the difference between a purchase requisition and a purchase order?
Under which business scenario split valuation is used?
I have created COST CENTER XXXX for Company Code XXXX. Again created Another Company Code ABCD, How to Copy Cost Center from XXXX to ABCD