Answer Posted / shaikh muddasir
1cum=0.353 brass
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Draw the cross section of a boundary wall and label its part with detailing?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What is the significance of cost estimate knowledge for an architect?
pls mail some more tecnical qustions at msaranya2610@gmail.com
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
what is pile and deam foundation
What is Density of cement, sand & aggregate ?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?