how much quantity a carpenter do shuttering per day
Answer Posted / shawaiz khan
3 to 4 m2 per day should be done by carpenter with one helper
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What is componsation
I am called for interview from north east power plant .so, I need some interview question which may help me.
Design a rectangular channel.
why we are using stub column..? is it possible to construct steel stub column..?
what is the dimensions of river sand truck trailer or trolly ?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
how to calculate reinforcment in staircase cranked beam?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
whou haat goals do you have in your career
how calculate the bearing from two coordinates?
Why is the statue of liberty made of copper?
water leak detection system question & answer
How can you distinguish between sorption, absorption and adsorption?