What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / kirishnasekar m
all sides - next day itself (24 hours)
slab < 4.5 m-7 days
slab > 4.5 m-14 days
beam & arches < 6.0 m-14 days
beam & arches > 6.0 m-21 days
staircase waist-7days, after removal of shutter, props to be fixed for 3 days
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
2nd and 4rt angle elevation used in which country ?
How to design staircase.plz tell me formula for the design the staircase.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
any book or article on pumped concrete.
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What are the composition of a landfill?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
how to estimate material requirement for an area of house in square feet?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
why we are useing plastic under the lean concrete?and whts the advantage?
Define What is the meaning of a blue land surveyors flag?