What is mean concrete class c35/20. Here C35 and 20 means?

Answer Posted / ross hampton

this is a old description (in UK and europeon standard terms). C35 is the cube crushing strength and 20 is the aggregate size. Strength wise now this would be called C28/35. 28 being the cylinder crushing strength and 35 the cube. The aggregate and constituent materials that make up the concrete will be different though.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

2506


what is education Cess.

1744


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1663


why is the column design?

1833


how to find ssm in foundation?

1438






660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1107


 What is difference between limit state and working stress method? How it is applies in building structure.

1776


what is the criteria for the finalisation of pavement thickness in road project?

1594


How many are the types of joints?

692


rate analysis for cement pointing 1:4 , for 100 sq m

3704


What is the cemnent ratio

1828


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

640


what is the Asfalt test?in road constraction..?

1652


What are the composition of a landfill?

685


Why should you consider yourself fit to be hired by jindal steel.

3931