Answer Posted / harsh patel
Contract demand is the total power (KW or KVA) required by the customers and written agreement done with supplier.while maximum demand is the peak load recorded for intervals of some particular time such as 15 minute or 30 minute.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
why we are not giving the zone 1 trip command to the master trip relay
What is current divider rule (cdr)?
For the requirement of a furnace of temperature range up to 1200 oC using silicon carbide rods, What is the required rate of transformer needed (please do it with all details)?
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
actually i can't understand what is 3dB ? and it's really not clear to me.please any one let it me be cleared.
what is mean by PIR in circuitbreaker and give me detail of that?
what is the efficiency of thyristor
If 24 KVA AVR having Input voltage 200-400v, Output voltage 415+-1%, what will be the voltage if Load is 13A.
How does a battary stores charge in it? please explain in simple manner and in detail.thanks
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
What will happen if the armature resistance is in minimum position and the field resistance is in maximum position while starting the motor
what is the difference between Power and Distribution transformers ?
Could u pls tell me the NPCIL electrical engineering interview questions for Executive trainee, and also guide me how to face the interview.
What is the working mechanism of OLTC in Power Transformers????
I am going to appear for the RRB Chennai junior Engineer online exam. Please send me the previous exams question papers (also solved) to my mail id: rrkhandhar@yahoo.com