Answer Posted / padmas
Any type of testing Activities are performed as per the Project-Test Plan in which the duration of the testing is provided ,with schedules given in the direction of Project Plan.According to that it will be stopped.Each Testing will be carried out with test specifications with when to start/stop testing along with the test cases,testing types to be performed etc..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
What is a maturity level?
What is back to back testing?
What are the uses of test plans? What is the need of test plans and explain their significance
What is the difference between a bug, a defect and an error?
Explain the procedure for manual testing.
What is an mr?
What is sanity?
Hi, I am planing to give ISTQB - Foundation level exam. Can anyone forward the ISTQB materials at laxmi_002@rediffmail.com mail ID.
How do you go about testing a project?
what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?
what is agile model and spiral maodel?pls explain with an example?
What is the difference between IE, Opera & Mozilla Firefox in web Testing and which brower will think that is much better?
Why we have to do manual testing?
What is concurrent user hits in load testing?