how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / karim
Quantity: 1cum
Proportion: 1:2:4[M15]
Add 54% extra
[54/100×1]+1=1.54cum
Cement required =1.54/7=0.22cum
We know: 1bag cement=0.0347cum
So, No of bags of cement =0.22/0.0347=6.34bags
Sand required: [1.54/7]×2=0.44cum
1cum=35.347cft
So 0.44cum=15.55cft
Aggregate required =[1.54/7]×4=0.88cum
So,0.88cum=31.18cft
Finally,
[Cement required =6.34bags
Sand=15.55cft
Aggregate =31.18cft]
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what"s the sort of beams?
how much cement sand n bricks required in im3?and how much in plaster?
Define polar co ordinates.
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Water filter calculation formula
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What glue is least sticky?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
What is difference between limit state and working stress method? How it is applies in building structure.
how we check the thickness and line of ceiling plaster.
How to calculate brick work quantity?? Block work quantity??
How to find CN by using arcgis 9.3?