Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

For 160kw motor what size of cable and material is needed.?

Answer Posted / dayasagar

for star delta starter the thump rule is cable sizing to be 2 X motor KW ie 160 kw motor require 160 sq mm since 160 sq mm is standard size it is better to go for 185 sq mm this rule applies for all star delta motors. here you can go for higher size
for DOL or VFD driven motors 2 time the KW ie 320 sq mm is required since 320 sqmm is not standard size it is better to go for 300 sq mm here you can go at lower size

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

My question is abt backlog.I had dropped one subject in my second year, and completed this subject in the 3rd attempt, so how many backlogs i have got?1 or 3?plz sujjest the answer as soon as possible

2080


what are the factors to be considered while design the breaker either HT or LT??

1873


What is the role of feedback in a closed loop control system?

1066


i am going to attaned the engineer (disign)iterview at HAL please give me duid line

2267


Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar

1798


what is alluminium arm in ab conductors

1980


Tell me in detail about c.t. And p.t. ?

1136


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2016


dear all i am kumara now current working in electrical designing of control and relay panel i want learn some substaion design then any book are available. pls mention name and authour

1936


How to calculate VCB rating for 33KV ,25 MW Power line?

1726


Why squirrel cage motor can only use with low starting loads ?

2033


STATE WORKING OF VACCUM CIRCUIT BRAKER?

1910


Whether power factor should be high or low? Why?

1103


how to check regenerative load in drived motor

2211


In case of salient pole alternator when number of poles are 4 or more than 4 it helps the flux wave to be sinusoid as air gap length is increased from center to tip , but if the number of poles are 2 how does the flux wave is sinusoidal?

1959