Why the rating of the HT breakers are in 1250 Amp, while
the load on the breaker is around 50 Amp. ?
Answer Posted / vikash kumar
HT breaker is sized based upon the fault current. Here 1250A is the fault current. 50A is the normal current and overload protection is provided by CT and over current relay.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Starting times for soft starter & power factor is thier any standard or datas available in manufactures list. Kindly suggest.
Explain Random and Deterministic signals?
I need to connect a synchronous generator to the grid using automatic synchronization and two circuit breakers (one for synchronization, one for end connection to the grid), how to determinate the required diameter of the cables?
write a program that prints prime numbers from 1-20 in digonal form
What is the formulae of Megger value for a A.C.Motor
What is meant by stator?
if two transformers are placed parallel & both have fault impedance of 50KA will it increase or decrease show example?
Explain the working principle of Synchronous Generator and Assynchronous generator?
difference between semiconductor & conductor & insulator?
Explain bypass capacitor?
How to reduce -234126219.6403 MVAr generation and by what?
Can you used moeller lzm1 mccb in a dc system with 125vdc and 20ka short circuit current , beside is it have 24 or 48 volt shunt ? Beside how long current can through from An MCB shunt contacts? (like Z7-AS 24 V)?
What is Surge Capacitor? Why it is use in Generator Circuit Breaker?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)