Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Partial Discharge test .Please specify that this
test can be test on 11/0.433 KV,630 KVA Transformer.

Answer Posted / khamesra.amit

PD is localised discharge which happens within the insulation because of small air pockets formed during winding insulation is being done in workshop. A Ultra high frequency signal is injected at the terminals which detects the frequeny and magnitude of electrical dischages. These values halps us in dentifying healthiness of insulation of the equipment.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i want bhel placement paper for electrical if anybody having pl send to my id kavitha867@myway.com immediately

1967


if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value

1910


WHAT IS THE DIFFERENE IN ACTION OF MCB,MCCB,RCCB

2411


Why use in ht motore

1674


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1919


How to arrange a hous hold earthing system to keep minimum earth resistance( below 7ohms).

1941


Determine the BTU size of an aircon for 20 sq metre room

1860


10 tube light connect in mcb breaker.one tube light is fault.so breaker is tribe.how fault is rectified.(using 3wire phase,earth,neutral)

2629


if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?

1893


why the check zone and main zone are used for Busbar Protn. scheem?

2164


pls tell me about ups internal connection & we have given only 3 phase supply to ups system how get 4 wire (R Y B N )

2745


Is there any rule to select the voltage of motor based on KW rating? What is the rating above which lt motor becomes the HT motor?.

1696


How to check the cable fault / hv test of transformer cable.

1861


what is sevice settings for mccb?How can be it setted?

1973


Why neutral point is consider as zero potential?

2601