What is Partial Discharge test .Please specify that this
test can be test on 11/0.433 KV,630 KVA Transformer.
Answer Posted / khamesra.amit
PD is localised discharge which happens within the insulation because of small air pockets formed during winding insulation is being done in workshop. A Ultra high frequency signal is injected at the terminals which detects the frequeny and magnitude of electrical dischages. These values halps us in dentifying healthiness of insulation of the equipment.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to select the double earth conductor if 21A full load?
What is the Resposiblity of Electrical Utility Engineer
what is the circutor?why we use it ?
What is the mmf,rgt and ngt please brief completely
how can i get an electrical c-certificate?
why impedance relay is used for medium transmission line protection
Define steady state error.
Why do we require transformer with less specific weight if supply frequency is increased?
State superposition theorem?
What does Bode plot tell you?
do we use links in a dc circuit?if so what s its use in it?
how a flip flop can be used as a latch?
what would happen if reactive power (kvar)is increased (more)or decreased (less)? how much exact reactive power should be maintained? and what should be done for that
write a program that prints prime numbers from 1-20 in digonal form
How to check the LM324 Ic