Answer Posted / mughal
50/1440 =0.0347cu.m
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the reasons for geotechnical site investigations in uganda?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
is basic cost of the material includes tax?
Which type of plywood & sizes using in construction projects ?
Define a polyline?
What are some facts about concrete?
what is the difference between tsp & tower
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Detection of a beam & a girder areββββ
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Why reinforcement done in shorter span in two way slabs
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?