how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / j swati.
As for 1 Cu.m = 7850 kg Steel Required. Take 1% of 7850= Answer Is the 78.50 Kg
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can i get civil engineering test papers.......?????
what could be the production cost of 1 cum of concrete by CP30 plant
What is difference between code and standard and specification?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How many axes do cartesian coordinate system has?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
how to calculate total cost for slab 35'×8'
What is the software used in civil engineering?
PL.tell me about civil engineering questions with answer
What is structural frames or systems?
Describe the advantages and disadvantages of using plastic and timber fenders?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
For what purpose bedding is used under storm water drains?