for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
Answer Posted / ravi
bricks 500
volume of mortar =0.2035 m3
dry volume of mortar =1.33*.2035=.306 m3
cement =.306*1/7=.0403 m3
sand=.306*6/7=.362 m3
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
which formula used for calculate the area of segmental arch?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How to calculate brick work quantity?? Block work quantity??
How many types of slabs are there & how to design it?
how i can tak Quantity of mortar in block work
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What is meant by Crystal Concrete?
how to convert sand in Cft to Kgs
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
five benefits of using standard terminology in the measurement process
What is reinforced concrete?