Answer Posted / shyamdev mandal
IS-456:2000
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is diffrence between catchment area,watershed and basin?
What is the name of this multiplication factors ?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How do you compute volume of airflow?
What are some facts about concrete?
How high should the water tank be to provide a 60 psi at base of this water tower?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what are the layers of the national and heir aprox thickness??
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
What is the per cu. mt. price of ready mix in Gujarat region.?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is relation between SPT N value and driving piles after conducting a soil test?