why making capacity is more than breaking capacity?
Answer Posted / dipak
Here I want to add to Pratik answer. During fault, say on EHV line, line protection sense the fault and gives trip command to CB. The time involved from detection of fault to opening of CB(including response time of trip relay and CB opening mechanism) is about 30 to 40 msec. By this time, Sub transient and DC component of fault current get damped and CB actually get open in transient component of fault current.
However, during closing of CB, if fault is there on line(say dead fault), CB has to sustain Sub transient fault current during closing on dead fault. Hence, making capacity is always more than breaking capacity.
Also, CB is designed for considering its application as Generator CB because fault level is highest at generator terminal and therefore higher making and Breaking capacity is required for Generator CB.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????
List out the the types of Mounting Light fixture?
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.
What is a single phase autotransformer?
hi i will D.E.E.E.is completed pls send rrb diploma old qustion papaer sent in my e mail. i.d.
How can we calculate cable size in Low voltage & high voltage
What is Plank's Law?
Differentiate between Zero and Negative sequence current
how to calculate kvar in Akiva
What should be the percentage increase in length of the dead end clamp for bus bar conductor (Hawthorn) after hydraulic pressing and what should be the applied pressure?
As a electrical engineer.. what are the basic norms should follow in transformer oil testing.. 1.What is the Electrode type? 2.How long time you will give for oil testing?
electrical ques
why the NGR (neutral grounding resistor) always OFF during DG off?
What is meant by earthhing of a magnetic flow meter and when to use empty pipe detection?